If you’re looking to get a new electricity connection from GEPCO in 2024, it’s important to know the details about the demand notice fee and meter charges. GEPCO offers both single-phase and three-phase connections, and each has a different fee structure. In this guide, we’ll explain these charges, how to apply online and provide you with some important tips.
Meter Type | Meter Charges |
Single Phase | Rs. 8,500/- to Rs. 10,500/- |
Three Phase | Rs. 36,500/- to Rs. 50,000/- |
Contents
GEPCO Demand Notice Fee 2024
The demand notice fee is an important part of the process when applying for a new electricity connection. This fee is usually issued after the GEPCO team visits your location and approves your application. For single-phase connections, the fee is around Rs. 8,500, which includes the meter installation. For three-phase connections, the cost can range from Rs. 30,000 to Rs. 33,000. Remember, taxes and security deposits may increase the total amount to approximately Rs. 10,000 for single-phase and Rs. 40,000 for three-phase connections.
New Meter Charges for Single-Phase and Three-Phase Meters
After submitting the application, you’ll receive a demand notice that includes the new meter charges. For a single-phase connection, the basic meter installation fee is Rs. 8,500. However, depending on the length of the service cable, these charges can increase. For instance:
- If the cable length is up to 30 meters, the charge is Rs. 8,500.
- If the length is above 30 meters but less than 40, the cost rises to Rs. 10,500.
- Service lines above 40 meters will require an additional Rs. 800 per meter.
For three-phase connections, the meter charges are higher due to the complexity. For cables up to 20 meters, the fee is around Rs. 36,500, and for longer cables, it can go up to Rs. 50,000.
Key Points to Remember
When applying for a new GEPCO connection, keep the following important points in mind:
- Single-phase demand notice fee: Rs. 8,500 (approx.)
- Three-phase demand notice fee: Rs. 30,000 – Rs. 33,000
- Pay online: You can easily pay the demand notice fee through online banking or at physical banks.
- Processing time: The notice is usually issued within 2-3 weeks after the application is submitted.
How to Apply for a New GEPCO Connection
The application process for a new electricity connection can now be completed online. Follow these steps to ensure a smooth process:
- Step 1: Visit the official GEPCO website and fill out the application form.
- Step 2: Upload the required documents, such as proof of ownership and identification.
- Step 3: Once approved, GEPCO will send a team to inspect the site.
- Step 4: After inspection, the demand notice will be issued, which you can pay either online or at a bank.
GEPCO Unit Prices 2024
For those who want to know the current electricity rates, GEPCO’s unit prices vary depending on usage. Here’s the breakdown for 2024:
- For 1-100 units, the rate is Rs. 22 per unit.
- For 101-200 units, the cost increases to Rs. 32 per unit.
- For users consuming more than 700 units, the price is Rs. 65 per unit.
These rates are updated periodically, so it’s always a good idea to check your bill or GEPCO’s website for the latest prices.
Also Read: 5 Best Ways to Reduce Electricity Bill in 2024
Conclusion
Applying for a new electricity connection with GEPCO in 2024 is very simple, especially with the availability of the online application portal. Be sure to check the meter charges and demand notice fees before submitting your application, and keep in mind that you can always call the GEPCO helpline for further assistance.
FAQs
You should contact the GEPCO helpline if you do not receive a demand notice within 3 weeks.
Yes, you can log into your GEPCO account and view the application status under the ‘new connection’ section.
Yes, additional charges apply for service lines longer than 40 meters.