Getting a GEPCO new connection has become easier and more convenient since the launch of online application services. As the population expands, so does the demand for new homes and, consequently, new electrical connections. Many consumers are unaware of the specific actions and paperwork required for applying for a new connection. This article explains how to apply for a GEPCO new connection, both online and manually.
Steps | Details |
Choose Connection | Decide between single-phase and three-phase depending on your electricity needs. |
Gather Documents | Collect ID copies, property papers, neighbor’s bill, and a wiring test report. |
Apply Online | Fill out the application form on the GEPCO website or visit the sub-office. |
Submit Application | Complete the application by submitting all required documents. |
Contents
Manual Application Process for GEPCO New Connection
There are two ways to apply for a new GEPCO connection by visiting the sub-divisional office or by using the online portal. The typical manual approach is going to the local GEPCO office and completing the new connection form. You’ll need to supply basic information like your name, address, and phone number, as well as a copy of your CNIC and property ownership paperwork. If you do not own the property, you must also attach the Owner’s Permit on stamp paper. After submitting these documents, the office will issue you a receipt.
How to Apply Online For GEPCO New Connection
Applying for a GEPCO new connection online is the more convenient option. GEPCO’s user-friendly portal allows you to register and submit an application from the comfort of your home. You’ll need to gather the following documents before you begin the online application:
Once you have these documents, follow the steps below to complete your online application:
- Visit the ENC Official Website https://enc.com.pk/.
- Click on the “Apply” option.
- Fill in the required information, including your connection type, personal details, and premises information.
- Attach the scanned copies of the necessary documents in JPEG format.
- Agree to the terms and click “Submit” to complete your application.
Important Documents Needed for GEPCO New Connection
Before applying, make sure you have the necessary documents ready. This will save time and make the process smoother. Here’s what you’ll need:
After gathering these, proceed with the application and attach these documents as required. Make sure they are in JPEG format if applying online.
Steps to Track Your GEPCO New Connection Application
Once your application has been submitted, you can track its status easily using GEPCO’s online portal. Simply follow these steps:
This will provide detailed information on the progress of your new connection request.
GEPCO Demand Notice and Fees
When your GEPCO new connection application is approved, a demand notice will be sent. This notice specifies the charge for installing the new connection. The charge typically ranges from PKR 9,000 to PKR 12,000, depending on your location and distance from the nearest electric pole. The demand notice applies to the installation of an electricity meter and up to 40 meters of wiring. If your property is located further away from the power supply, you may incur additional wiring charges.
Conclusion
Applying for a GEPCO new connection has never been easier, whether you apply online or in person. With this guidance, you can easily navigate the process and ensure that you supply all of the required documents. The online application process is faster and more convenient, as it allows you to apply from the comfort of your own home rather than having to visit the subdivisional office. Once your application is received, GEPCO will walk you through the next stages, such as paying the demand notice and having your meter installed.
FAQs
The fee for a new GEPCO connection typically ranges from PKR 9,000 to PKR 12,000, depending on your location and wiring requirements.
You need a copy of your neighbor’s bill, property ownership documents, attested copies of your CNIC, a witness’s CNIC, and a wiring test report.
To apply online, visit the ENC website, fill out the application form with the required details, and attach scanned copies of your documents. Then submit the form online.
You can track your application by visiting the ENC portal, selecting “Track,” and entering your CNIC or tracking ID to view the status of your application.